Spacex, a rocket company of Billionaire Elon Musk, reported that the American Space Agency NASA and AXIOM have set the date of the launch of June 22 for the mission. The postponement of this mission will help the NASA review the operations inside the Zvezda service module of ISS. Spacex’s Falcon 9 rocket from California’s Kennedy Range Center in the US will fly with the spacecraft Dragon of this mission. This will be the first flight of Dragon Spacecraft and the second Falcon 9 rocket.
The health of the four astronauts included in this mission is good. These Astronauts are taking pre-flight training. Earlier, the date of June 19 was fixed for the launch of this mission. The NASA had reported that the Falcon 9 rocket repaired the liquid oxygen leaks. After this, Spacex has also tested it. This space mission was to be launched on 29 May. However, after this it was postponed on 8 June, 10 June and 11 June.
In the Axiom-4 mission, the responsibility of Mission Kamadar will be with America’s Pegy Whitson. The American Space Infrastructure Developer Axiom Range has reported that this is the first time in the last 40 years that the US government has approved a spaceflight with Astronauts in India, Poland or Hungary. India’s first astronaut Rakesh Sharma made history by reaching space in 1984. However, Shukla will be the first Indian pilot of a spacecraft. These astronauts have been given strong training. These will do many experiments on ISS. Seven of these experiments will be led by Shukla. There is a participation of 31 countries in this mission.
Download the Gadgets 360 Android app for the latest tech news, smartphone review and exclusive offer on popular mobiles and follow us on Google News.
Range, Nasa, Spacex, Project, Information, Elon Musk, Govt, The US, Falcon 9, Shubhanshu Shukla, Experiments, ISS, Spacecraft, ISRO, Safety